Specified, procured, installed and handed over — working.
YTC AI designs, sources and delivers accelerated computing infrastructure for enterprises — from the first requirement to a platform running in production and, where the client wants it, the application that runs on it. One accountable party from requirement to handover.
Six service lines, one chain
From the first requirement conversation to a platform running in production, and the application layer above it. Each line exists because it is a place where AI infrastructure projects usually come apart.
Four things settled before an order is placed
Most failed AI infrastructure programmes fail between the parties: the vendor delivered, the facility was not ready, the file was incomplete, and nobody owned the gap. These four are how we close it.
Capacity where it is needed
Tier IV and Tier III facilities across the Middle East, Japan, South Korea and Southeast Asia, arranged through contracted operators and confirmed against the specific platform before any order. We are not a data centre operator; what matters is the reach, and the power behind it.
Current on every generation since Hopper
Hopper-generation delivery from 2023 across the Middle East, Southeast Asia and Japan; Blackwell in delivery now. A greenfield data centre programme in Kumamoto, Japan, planned from requirement through to groundbreaking.
Send the workload profile
Model sizes, concurrency, growth. A vendor-neutral reference architecture comes back, yours to take anywhere. Nothing in it depends on buying the hardware through us.
