Facilities & Power
Capacity where it is needed
We are not a data centre operator. Capacity is arranged through contracted operators, held under our contract, and confirmed against the specific platform before any order. What matters is the reach, and the power behind it.
TIER IV AND TIER III
Reach across four regions
Facilities across the Middle East, Japan, South Korea and Southeast Asia, including completed deployments in a Tier IV facility in Malaysia.
CONTRACTED OPERATORS
Held under our contract
Capacity is arranged through operators and held under our contract. The client deals with one party for the facility, the schedule and the outcome.
BEFORE ANY ORDER
Confirmed against the platform
Power, cooling and floor are confirmed against the specific platform before hardware is ordered. The answer changes by generation.
Why Sarawak
Built beside the power
Headquartered in Kuching, Sarawak, on a grid anchored by hydroelectric generation, with capacity headroom while established regional corridors queue for grid allocation.
HYDRO-ANCHORED GRID
Hydropower at the source
Sarawak's grid is anchored by hydroelectric generation, with further capacity commissioning this decade and expansion stated state policy.
PRICE AND HEADROOM
Tariff and headroom
Industrial power in Sarawak is priced below established regional hubs, and there is generation headroom while those corridors queue for grid allocation.
LOW-CARBON COMPUTE
A defensible carbon position
Increasingly a procurement requirement rather than a preference, and difficult to retrofit onto a gas-fired grid.
Facility Readiness
Power, cooling and space
Rack density decides cooling mode, and cooling mode decides which facilities are eligible. This is settled before procurement, because a facility change after order is a schedule reset.
Power
- Utility feed capacity and headroom
- Feed redundancy, tested
- Generator and UPS runtime at target load
- Metering at rack level, not room level
Cooling
- Mode matched to rack density
- Capacity headroom above design load
- Failure mode: time to thermal limit
- Containment integrity and bypass airflow
Space
- Contiguous rack space
- Floor loading against the loaded rack
- Service clearance and delivery path
- Cable pathway and staging area
Assessed against the specific rack build, not the rack specification. Facility identities, capacity contracts and site documentation are disclosed under NDA during the facility phase of an engagement.